Question 3 • CA-Statistics and Probability B
The sample mean has mean $7.19 and standard error $0.86/√12 ≈ $0.248. For a sample mean of $7.00, the z-score is (7.00 − 7.19)/0.248 ≈ −0.77. Thus, the probability the mean cost is more than $7.00 is P(Z > −0.77) ≈ 0.7780, so the correct choice is 0.7780.
AI-written and checked against the verified answer.